Cost Control Engineer

Engineer

Cost Control Engineer

Apply Now

- 0.00

  • Date posted
    May 4, 2026
  • Expiration date
    August 4, 2026
  • Application ends
    August 4, 2026

We are seeking a Cost Control Engineer (Governance) to embed a true “owner’s check” inside the preconstruction team. This role owns the cost governance truth system used to keep budgets and scope assumptions consistent, traceable, and defensible as projects advance from concept into contract-ready execution. This role does not run procurement or contract execution. It owns the project budget baseline and the structured change-control mechanism as scopes and assumptions evolve. It makes sure the cost model and supporting assumptions are clear, consistent, and easy to audit. When inputs are missing or uncertain, the role flags what is unknown and what is needed to close the gap.

This role partners tightly with pre-construction, procurement, development/engineering, construction, and finance.

What you’ll do

  • Project budget compilation (viability): Build and maintain the project-specific cost baseline used to assess commercial viability, using a standard reference design + quantified variances. Ensure the budget is complete, internally consistent, and decision-grade.
  • Budget governance and change control: Maintain a structured log of potential cost increases/decreases as assumptions evolve. Periodically recommend budget adjustments, with clear rationale, traceability, and an audit trail.
  • Reference design + variance engine: Build and maintain standardized reference cost models by configuration and the quantified variance drivers used to price deltas off schematic inputs (including subsurface and site diligence inputs as available).
  • Allowance & confidence scoring discipline: Enforce explicit allowances for uncertainty (no hidden contingency in unit rates) and maintain a standardized confidence scoring rubric as scope maturity increases.
  • Bid-to-BoQ normalization: Normalize contractor proposals into a standard BoQ/cost code structure so bids are comparable apples-to-apples and can be cleanly mapped into the budget model.
  • Estimate-to-actual reconciliation: Reconcile model outputs to quotes, bids, and awards. Update unit rates and variance logic so the system compounds over time.
  • Change sensitivity (“delta pricing”): Maintain a library of common scope-change drivers and unit-rate deltas to enable rapid “what does this change do to cost?” analysis.
  • Escalation of unknowns: When a cost package is not complete, document gaps and required follow-ups. Flag what is unknown and what is needed to close the gap.
  • Artifact traceability: Maintain a clean audit trail for assumptions, sources, and model updates, including a change log for the unit-rate and variance libraries.

Requirements

  • Education: Bachelor’s degree in Engineering, Construction Management, Quantity Surveying, or a related field.
  • Cost Modeling: Demonstrated ability to build and maintain unit-rate models and reconcile them to real market pricing.
  • Experience: 5+ years of experience in cost engineering, estimating, project controls, or preconstruction for complex projects (energy, utility, industrial, or comparable).
  • Commercial & Scope Rigor: Strong command of scope definition, cost-code structures, and bid leveling / normalization.
  • Governance Mindset: High standards for assumptions hygiene, traceability, and document control; able to enforce standards without being the “doer” for every task.
  • Communication: Ability to write concise decision-grade readouts: what changed vs baseline, what is uncertain, and what requires escalation.
  • Are you interested in this position?

     

    Apply by clicking on the “Apply Now” button below!

     

    #AlbionarcJobs#FintechJobs

    #AsiaJobs#MiddleEastCareers

    #TechTalent#FintechRecruitment

    #FinanceOpportunities#

     

     

     

Apply Now

- 0.00

Select your currency